Cost Estimators vs Production, Planning, and Expediting Clerks
Side-by-side · O*NET · BLS · AI-exposure research · Anthropic Economic Index
A factual, source-backed comparison of Cost Estimators and Production, Planning, and Expediting Clerks on the dimensions both occupations carry. Every figure is a position within an independent published dataset — not a verdict on which job is better, safer, or more “future-proof.”
At a glance
| Dimension | Cost Estimators | Production, Planning, and Expediting Clerks |
|---|---|---|
| Median pay | $77,070 | $57,770 |
| Employment | 219,530 | 385,000 |
| Employment outlook (2024–34) · BLS projection | Declining (-4.2%) | Declining (-1.8%) |
| Annual openings · BLS projection | 16,900 | 34,100 |
| Typical education · O*NET | Most of these occupations require a four-year bachelor's degree, but some do not. | Usually requires a high school diploma or GED, though some occupations may not. |
| AI exposure · published exposure studies | High · 81st pct | High · 83rd pct |
| Global GenAI gradient · ILO ISCO-08 · via crosswalk | 82nd pct · 45% of tasks | 81st pct · 44% of tasks |
| Observed AI use · Anthropic Economic Index | Augmentation-leaning (39.1%) | Automation-leaning (31.8%) |
| Mostly remote-capable · Dingel–Neiman | Yes | No |
Pay and employment are BLS OEWS estimates; outlook and openings are BLS 2024–2034 projections; AI exposure and observed-use figures come from separate research and reflect exposure and usage, not predictions that either job will disappear. Compare like with like.
Skills
Shared: Mathematics, Inductive Reasoning, Reading Comprehension, Mathematics, Oral Comprehension, Oral Expression, Speaking, Written Comprehension, Number Facility, Active Listening, Critical Thinking, Written Expression, Deductive Reasoning, Near Vision, Judgment and Decision Making, Information Ordering, Writing, Computers and Electronics, Speech Clarity, Complex Problem Solving, Active Learning, Speech Recognition, Administration and Management, English Language, Social Perceptiveness, Coordination, Problem Sensitivity, Category Flexibility, Monitoring, Systems Analysis, Systems Evaluation, Time Management.
Specific to Cost Estimators
- Mathematical Reasoning
- Economics and Accounting
- Engineering and Technology
- Building and Construction
- Design
- Management of Financial Resources
- Persuasion
- Negotiation
Specific to Production, Planning, and Expediting Clerks
- Production and Processing
- Customer and Personal Service
- Administrative
- Selective Attention
- Perceptual Speed
- Far Vision
- Fluency of Ideas
- Flexibility of Closure
Knowledge, skills & abilities O*NET rates as important for each occupation. “Shared” are common to both; the columns list what is distinctive to each (top by the order O*NET surfaces).
Tools & technology
Shared: Spreadsheet software , Office suite software , Electronic mail software , Document management software , Accounting software , Data base user interface and query software , Presentation software , Project management software , Word processing software , Enterprise resource planning ERP software , Graphics or photo imaging software , Financial analysis software .
Specific to Cost Estimators
Specific to Production, Planning, and Expediting Clerks
Full profiles
This page is a summary. See the complete source-backed profile for Cost Estimators or Production, Planning, and Expediting Clerks — tasks, the full skill graph, tools, work context, preparation, wages by percentile, industries, AI exposure and the AI work map.
More comparisons
Related occupations you can place side by side on the same sourced scale.
- Cost Estimators vs Logistics Engineers
- Cost Estimators vs Civil Engineering Technologists and Technicians
- Cost Estimators vs Construction Managers
- Cost Estimators vs Industrial Engineers
- Cost Estimators vs Architectural and Engineering Managers
- Cost Estimators vs Architectural and Civil Drafters
- Cost Estimators vs Civil Engineers
- Cost Estimators vs Project Management Specialists
Sources for this page
Every figure above traces to a named public dataset and the exact release below — not hand-written opinion. See the full methodology for what each measure does and does not mean.
- O*NET 30.3 U.S. Department of Labor / National Center for O*NET Development
- BLS Occupational Employment and Wage Statistics (OEWS) May 2024 U.S. Bureau of Labor Statistics
- BLS Employment Projections 2024–2034 U.S. Bureau of Labor Statistics
- Anthropic Economic Index v4 (2026-01-15) + v2 (2025-03-27) Anthropic
- Microsoft “Working with AI” working-with-ai Microsoft Research
- “GPTs are GPTs” (Eloundou et al.) arXiv 2303.10130 OpenAI / academic
- AI Occupational Exposure (AIOE) Felten, Raj & Seamans academic
- ILO / Gmyrek et al. GenAI exposure gradient 2025 International Labour Organization
- IBS O*NET-SOC ↔ ISCO-08 occupation crosswalk 2022 Institute for Structural Research (IBS)
- Frey & Osborne (2013) frey-osborne-automation academic
- Dingel & Neiman (2020) dingel-neiman-workathome academic
Data compiled June 2, 2026. Figures are estimates, not advice.
Cite this page
Singulariki. "Cost Estimators vs Production, Planning, and Expediting Clerks." Singulariki: a source-backed encyclopedia of work. Built from O*NET 30.3; BLS Occupational Employment and Wage Statistics (OEWS) May 2024; BLS Employment Projections 2024–2034; Anthropic Economic Index v4 (2026-01-15) + v2 (2025-03-27); Microsoft “Working with AI” working-with-ai; “GPTs are GPTs” (Eloundou et al.) arXiv 2303.10130; AI Occupational Exposure (AIOE) Felten, Raj & Seamans; ILO / Gmyrek et al. GenAI exposure gradient 2025; IBS O*NET-SOC ↔ ISCO-08 occupation crosswalk 2022; Frey & Osborne (2013) frey-osborne-automation; Dingel & Neiman (2020) dingel-neiman-workathome. Accessed June 7, 2026. https://singulariki.com/compare/cost-estimators-vs-production-planning-and-expediting-clerks
Singulariki. (2026). Cost Estimators vs Production, Planning, and Expediting Clerks. Singulariki: a source-backed encyclopedia of work. Retrieved June 7, 2026, from https://singulariki.com/compare/cost-estimators-vs-production-planning-and-expediting-clerks
@misc{singulariki-cost-estimators-vs-production-planning-and-expediting-clerks,
title = {Cost Estimators vs Production, Planning, and Expediting Clerks},
author = {{Singulariki}},
year = {2026},
note = {O*NET 30.3; BLS Occupational Employment and Wage Statistics (OEWS) May 2024; BLS Employment Projections 2024–2034; Anthropic Economic Index v4 (2026-01-15) + v2 (2025-03-27); Microsoft “Working with AI” working-with-ai; “GPTs are GPTs” (Eloundou et al.) arXiv 2303.10130; AI Occupational Exposure (AIOE) Felten, Raj & Seamans; ILO / Gmyrek et al. GenAI exposure gradient 2025; IBS O*NET-SOC ↔ ISCO-08 occupation crosswalk 2022; Frey & Osborne (2013) frey-osborne-automation; Dingel & Neiman (2020) dingel-neiman-workathome. Accessed June 7, 2026},
url = {https://singulariki.com/compare/cost-estimators-vs-production-planning-and-expediting-clerks}
} Citations name the underlying public dataset releases — they reflect what this page is built from, not just the URL.